Link Mall / Car Screens, Northlakes
Scope of Works
- Design, Supply and Install Alucobond Cladding.
- Design, Supply and Install RHS feature screens prefinished in timber including steel PFC channels
- Design, Supply and Install Gro-Wall screens to all carparks, including 3mm solid Aluminium cassettes.
Challenges
Programme was very tight on this particular project. The client had strict opening dates which needed to be achieved.
Summary
Auzmet worked collectively with Scentre Group to successfully complete the Carpark screen before opening day of the new shopping centre.