Scope of Work
ACM panels, metal coping, and custom metal panels.
Challenges
Framing delivered to site did not meet engineering requirements, forcing Auzmet to self-perform additional framing to keep the project on schedule. Additional complications arose during coping installation at the handrails. After several mockups and coordination with stakeholders, a two-part coping system was approved.
Summary
Installation occurred in phases over six months, beginning with roof panels and concluding with ACM on the main structure and garage. Despite frequent field modifications and evolving site conditions, the project was completed on schedule, maintaining a positive relationship with the general contractor.
JE DUNN
General Contractor
PAPPAGEORGE HAYMES PARTNERS
Architect of Record
PATRICK STODDARD
Auzmet Estimator
CHRISTIAN VANOVER
Auzmet Project Manager
CLEMENTE JARAMILLO
Auzmet Foreman